comments:
S2109 on the rear of a possibly failed 221 empty Alumina train at Wellard loop. S2103 was on the front with 34 XF wagons.
date added:
22 October 2004
comments:
S2103 on 221 empty alumuna train at Wellard. S2109 was attached to the rear to take the train back to Kwinana yard.
date added:
22 October 2004
comments:
DB1589/DA1574/P2002 on 363 empty grain after finishing at Kwinana CBH. Q309 on 050 is passing the train into the unloading area. Narrow gauge 322 grain was also unloading.
date added:
22 October 2004