Welcome to perthtrains.nachohat.org Trains in Perth and Western Australia
Trains in Perth and Western Australia
Browse by Operator | Class | Number | Location | Date | Search

P2516/DAZ1905/AB1503 on 336 grain from Beacon pass the new CBH facility on the outskirts of Dowerin. Australian Railroad Group P class P2516
at Dowerin, Thu 09 April 2009

comments:
P2516/DAZ1905/AB1503 on 336 grain from Beacon pass the new CBH facility on the outskirts of Dowerin.
date added: 21 June 2009

open image in new window

P2516/DAZ1905/AB1503 on 336 grain from Beacon race through Berring on the approach to Goomalling. Australian Railroad Group P class P2516
at Berring, Thu 09 April 2009

comments:
P2516/DAZ1905/AB1503 on 336 grain from Beacon race through Berring on the approach to Goomalling.
date added: 21 June 2009

open image in new window

P2516/DAZ1905/AB1503 on 336 grain from Beacon enter Goomalling at the junction with the McLevie line. Australian Railroad Group P class P2516
at Goomalling, Thu 09 April 2009

comments:
P2516/DAZ1905/AB1503 on 336 grain from Beacon enter Goomalling at the junction with the McLevie line.
date added: 21 June 2009

open image in new window

P2516/DAZ1905/AB1503 on 336 grain from Beacon at East Northam. Australian Railroad Group P class P2516
at East Northam, Thu 09 April 2009

comments:
P2516/DAZ1905/AB1503 on 336 grain from Beacon at East Northam.
date added: 21 June 2009

open image in new window

P2516/DAZ1904 on 365 empty grain passes under the Great Eastern Highway at Bellevue. Australian Railroad Group P class P2516
at Bellevue, Sat 21 March 2009

comments:
P2516/DAZ1904 on 365 empty grain passes under the Great Eastern Highway at Bellevue.
date added: 22 March 2009

open image in new window

P2516/DAZ1904 on 365 empty grain approach Avon Yard on the big curve. Australian Railroad Group P class P2516
at Avon Valley, Sat 21 March 2009

comments:
P2516/DAZ1904 on 365 empty grain approach Avon Yard on the big curve.
date added: 22 March 2009

open image in new window

P2516/DAZ1904 after a quick crew change at Avon becomes 335 empty grain to Beacon seen here snaking through the back of Northam. Australian Railroad Group P class P2516
at Northam, Sat 21 March 2009

comments:
P2516/DAZ1904 after a quick crew change at Avon becomes 335 empty grain to Beacon seen here snaking through the back of Northam.
date added: 22 March 2009

open image in new window

P2516/DAZ1904 on 335 empty grain with 55 wagons approach Yarramony and then Jennacubbine on the line to Goomalling. Australian Railroad Group P class P2516
at Yarramony, Sat 21 March 2009

comments:
P2516/DAZ1904 on 335 empty grain with 55 wagons approach Yarramony and then Jennacubbine on the line to Goomalling.
date added: 22 March 2009

open image in new window

P2516/DAZ1904 on 335 empty grain pass the CBH bins at Goomalling. Australian Railroad Group P class P2516
at Goomalling, Sat 21 March 2009

comments:
P2516/DAZ1904 on 335 empty grain pass the CBH bins at Goomalling.
date added: 22 March 2009

open image in new window

P2516/DAZ1904 on 335 empty grain left off some smoke as they race through Nambling between Goomalling and Dowerin. Australian Railroad Group P class P2516
at Nambling, Sat 21 March 2009

comments:
P2516/DAZ1904 on 335 empty grain left off some smoke as they race through Nambling between Goomalling and Dowerin.
date added: 22 March 2009

open image in new window
displaying images 1 to 10 of 29 - Next Page
images per page: 5, 10, 20, 50, 100
sort images: operator, class, location, date, date added
Random Image
NR17 on 2PA8 Indian Pacific leaving the Perth Suburban Electric network and approaching Midland Station.

Latest Images
22-Jun-09 (14)
21-Jun-09 (17)
20-Jun-09 (2)
22-Mar-09 (18)
16-Mar-09 (14)
15-Mar-09 (22)
30-Jan-09 (21)
29-Jan-09 (13)
30-Nov-08 (18)
29-Nov-08 (10)

Popular Searches
Transperth
Transwa Prospector
Transwa Australind
Indian Pacific
Spirit of the West

contact perthtrains-admin.